Arcadia 85' (2019)
Contemporary elegance and unmistakable lines come together in this Arcadia 85', a perfect balance between innovative design and efficiency. The boat offers large bright spaces, thanks to the panoramic windows and the eco-friendly philosophy typical of the shipyard.
With 4 cabins for 8 guests and 4 crew members, it guarantees maximum comfort and privacy on board. Performance is ensured by 2 MAN i6 engines with 730 hp, which combine reliability and economy of navigation.
An exclusive opportunity to experience the sea with style, sustainability and discreet luxury.
JOB LIST 2024/2025
- They cut engines
- Servicing generators
- Cleaning of hull, water tanks, grey water tanks, black water tanks, sea intakes and internal filters.
- Watermaker maintenance (cylinder cleaning and filter replacement)
- Cleaning and disinfecting the air conditioning system + replacing filters
Electronics Works:
- Replacement of 12 service batteries
- Replacement of engine batteries
- Replacement of generator batteries
- Pump overhaul
- Winch and bow winch overhaul
- Boiler cleaning n.2
- Replacement of the stern platform pump motor
- Replacement of gangway and stern platform push-button panel
- Replacement of voltage adapters, motors, sliding blinds, blackout panels, solar panels
- Mounting STARLINK antennas + electronic control and PC box control panel
- Replacement of the saloon LED and control of the entire lighting system
- Check all toilet solenoid valves and replace a toilet shredder
- New owner's cabin lighting board
- CME stabilizer fins software check and update (extraordinary intervention of the fins carried out: 6 years, in 2 years also make reducers)
Upholstery and carpet work:
- Replacement of saloon carpet, dashboard
- Replacement of salon curtains
- Replacement of outdoor sofa fabrics (cassina)
- Washing of interior sofa fabrics
- Replacement of 8 outdoor table chairs + 2 new director's chairs
- New bow cushions
- Replacement of all sofa, bow, posppa and fly cups
- Replacement of tender cushions + reinforcements on tubulars
- Replacement of new crew cabin mattresses
Painting and polishing work:
- HULL: propellers, axles and rudders treatment, Propspeed + Sealight treatment
- Complete waterline renovation
- Touch-ups on the bulwarks, arch and on gray solar panels on the aft side
- Painting of the walkway + tubulars
- Total sanding of teak deck
- Complete boat polishing
LARGE PHOTOGRAPHIC SET ON REQUEST
ENGINE HOURS APPROX. 1,520 on 15/09/2025
Data considered correct but not contractual. This does not constitute a contractual document under any circumstances. The price displayed is to be considered net of agency commissions to be applied on the final closing value.
Mediation conditions for the buyer: By receiving the information contained in this document relating to the boat of interest, the recipient acknowledges RYB Srl as the maritime mediator of the negotiation.
Commission: a commission of 5% + VAT on the established price will be payable by the buyer to RYB SRL (only in case of purchase), unless otherwise agreed in writing between the broker and the buyer.
Any third parties involved by the buyer (other mediator, consultant, captain, etc.) must be declared in advance. Co-brokerages or third-party commission claims involved by the buyer not promptly communicated and approved in writing by RYB SRL will not be acknowledged.