craft
Engines landed, completely overhauled not at 0 o'clock because they were in perfect working order but general overhaul including painting, new turbines 2025, new autopilot 2025 complete, feet completely overhauled 2025, hull 0, all work with demonstrable invoices, tank cleaning.
Works carried out 2023:
New battery wiring, left foot overhaul, blue LED cockpit lights, new sonar transducer, new 1500 W stereo system, bow and stern external cushions + bridge seat all new 2023, Piooner radio with amplifier, new Raymarine GPS, windlass service, dashboard panel + buttons all new, new gangway remote controls + control unit + new hydraulic lines + solenoid valves, new batteries 2023, new bilge pumps + 1 stripped, 220 V sockets in the bedrooms, new mattresses in the bedrooms, new bow and stern awning, new central curtain structure, new shower + pipes, new 220 V connection, new remote gangway, new 32-inch TV, luicidation September 2023
Please note that the data provided by the owner is considered correct but not guaranteed and not contractual. The photographs used may be different from the current state of the boat and some of them may be from the stock market.