Works carried out: Complete polishing, Silicone coatings of side and front windows, Teak silicone coatings on cockpit steps and platform, Assembly of 4-arch stainless steel bimini for flybridge, Assembly of two 12 V cockpit power sockets, Assembly of 3 batteries of 180 A for services 1 engine and 1 battery for bow thruster 105 In July 2024, Construction of a black water system, Cockpit light replacement, Silicone coupling of deckhouse deckhouse, Installation of autopilot remote control, stern platform rubberization, stainless steel bow anchor protection, new Eurovinyl COASTAL DRY 10-person raft, new bow cushions with relative protective cover, new fly cushions complete sofa and chaise lounge, new stern cushions seats and round backrests, total fly closure, total cockpit closure, gangway protection, new carpeting, new side and front window covers.
Please note that the data provided by the owner is considered correct but not guaranteed and not contractual. The photographs used, if indicated, may be from the archives.